Sunday, September 25, 2005

Rain is Good (Special - This Weekend Only)

Usually you don't really wish for rain during a construction project*. But we've reached one of those few days during our construction project where rain actually is quite helpful.

*Unless of course you're building a rainwater collection system and have the roof hooked up to the cisterns. Then we'll want lots of rain to get the cisterns full for the winter ;-)

On Friday the crew from Clark Construction filled the floor of the lower level with sand to prepare for the pouring of the concrete slab next week. And the rain that we've gotten this weekend will help to pack the sand down (although it's been raining off and on for about 24 hours now and I'd be fine if it stopped now - it's getting too slippery on the clay around the house).

The picture to the left shows the lower level with the filled-in sand. The two lonely walls in the center are the support for the poured concrete ceiling (the cDeck) to leave an opening for the stairs. The concrete slab to the right is the support for the masonry stove. Left of the support walls you can see a shallow trench which is for the drain of the kitchen sink and dishwasher.

So the rain will do a good job of packing the fill-sand down for the pour of the concrete slab next week.

Comments: Post a Comment

<< Home

This page is powered by Blogger. Isn't yours?